| Project &
Client |
Description |
| Soil Investigation for CEA land
at Battaramulla (Ministry of Environment - 1992) |
Advancing boreholes, carrying out
field and lab testing, recommendation for foundation design. |
| Quality control and construction
supervision - CEA land at Battaramulla (Ministry of Environment
- 1993) |
Advancing 160 boreholes within
the Greater Colombo area & Preparation of reports |
| Offshore geotechnical
investigation for a coal fired Thermal Power Plant at Kalpitiya
(Electrowatt Eng (Pvt) Ltd - 1994) |
Advancing boreholes at water
depth of 15m max. from 4 km away from the land and carrying out
required field and lab testing. |
| Soil Investigation for Eastern
University, Oluvil (University Gants Commission - 1995) |
Advancing boreholes, carrying out
field and lab testing, recommendation for foundation design |
| Geotechnical investigation for
Colombo Katunayake expressway and design of ground improvement
and road embarkment (RDA - 1996) |
Advancing of 243 boreholes within
the proposed trace (10-20km) at every each 100m. consultancy
testing, submission of reports |
| Offshore geotechnical
investigation for construction of two berths at the Ports of
Colombo (Sri Lanka Ports Authority - 1996) |
Advancing boreholes at 5m water
depth and carrying out required field and lab testing |
| Soil investigation for Export
Processing Zone, Meerigama (Board of Investment) |
Advancing boreholes, carrying out
field and lab testing, recommendation for foundation design |
| Geotechnical investigation for
Greater Colombo Flood Control & Environmental Improvement
Project (Sri Lnaka Land Reclamation & Development Corporation -
1997) |
Advancing 160 boreholes within
the Greater Colombo area and preparation of reports |
| Soil investigation for Kudawella
Fishery Harbour (National Aquatic Resources Agency - 1997) |
Advancing 30 boreholes near shore
and offshore by mounting the drill on a specially prepared
pontoon, testing, submission of reports |
| Soil investigation for Water
Supply Scheme - Chillaw (Chinese Export Team, China - 1998) |
Advancing of 20 deep boreholes
(60m deep) and recommendations for foundation design |
| Soil investigation for Matara
Kataragama Railway, Bridge across Nilwala (Government of Railway
- 1998) |
Advancing boreholes in mid river
(barge mounted), field and lab testing, report with
recommendations |
| Soil investigation for Beira Lake
Restoration study (ROCHE International - 1998) |
Advancing 15 boreholes by a
machine mounted on a barge, preparation of reports |
| Soil investigation for
Transmission Augmentation Project, Puttalm (Sri U Thong Co. Ltd.
- 1999) |
Advancing of boreholes, lab and
field testing, final report |
| Geotechnical investigation fo
rthe Japan-Sri Lanka friendship road ( Urban Development
Authority - 1999) |
Advancing of boreholes, lab and
field testing, final report |
| Soil investigation for Ten
Bridges (Japan Bridge & Street Inst., Japan - 1999) |
Advancing boreholes, carrying out
fields and lab testing, recommendation for foundation design |
| Soil investigation for
installation of Oil Storage Tank at Kolonnawa and Orugodagatta (GPEC
International Cabada - 1999) |
Advancing borehole installation
of Peiezometers and foundation recommendations |
| Project &
Client |
Description |
| Soil Investigation for Five Star
Hotel Complex at Ahungalla (Aitken Spence Ltd. - 2000) |
Advancing boreholes by Wash
Boring/Core Drilling method, recommendation on the foundation design. |
| Soil investigation for 2nd
medical ward complex for Sri Lanka National Hospital (Ministry
of Health and Highways - 2000) |
Conducting required field and
laboratory testing, recommendation of the foundation design |
| Soil investigation for new
Teaching Hospital at Moratuwa for Colombo South General Hospital
(Ministry of Health and Highways - 2000) |
Advancing boreholes carrying out
of field and lab testing, recommendation for foundation design. |
| Soil
investigation for the ward complex for Base Hospital at Kegalle
(Ministry of Health and Highways - 2000) |
Advancing boreholes
carrying out of field and lab testing, recommendation for foundation design. |
| Soil investigation for 12
storeyed building for Commercial Bank Union Place Branch
(Commercial Bank - 2000) |
Advancing boreholes carrying out
of field and lab testing, recommendation for foundation design. |
| Soil
investigation for the Extension of the Main Library of
Peradeniya University (Ministry of Housing - 2000) |
Advancing boreholes
carrying out of field and lab testing, recommendation for foundation design. |
| Soil investigation for proposed
Male Hospital for Peradeniya University ( Ministry of Housing -
2000) |
Advancing boreholes carrying out
of field and lab testing, recommendation for foundation design. |
| Soil
investigation for the Extension of Railway, Ratmalana Airport
(Airport & Aviation Ltd. - 2000) |
Advancing boreholes
carrying out of field and lab testing, recommendation for foundation design. |
| Addl. geotechnical investigation
for Colombo Katunayake Expressway - interchnges and overpasses
and frontage road (Road Development Authority - 2000) |
Advancing boreholes carrying out
of field and lab testing, recommendation for foundation design. |
| Feasibility
study for the Mini Hydro Power Station at Bambababotu Oya (Vidya
Silpa - 2000) |
Sub surface
investigation |
| Base-line road extension project
(Road Development Project - 2000) |
Sub surface investigation |
| Madiwela
government project supervision of land fill (Urban Development
Authority - 2000) |
Ground
improvement |
| Walawe Left Bank Irrigation
upgrading & extension project - phase-2,SI-P48 (Nippon-Koie Co.,
Japan - JICA funded project - 2000) |
Advancing 38 boreholes and 158
augure holes completed within 2 months |
| Southern
Transport Development 36.5km- ADB section southern part ( Wilbur
Smith Asso.Inc., USA - 2000) |
Overall
geotechnical investigation & lab testing and seissimic
refraction |
| Madiwela construction of gravity
retaining wall (Urban Development Authority - 2000/02) |
Design and construction
supervision |
|
Project & Client |
Description |
| Dodanduwa Fishery Harbour Project
(Ceylon Fishery Harbour - 2001) |
Offshore drilling |
| Southern
Transport Development Project II - Nothern part - 68km (Pacific
Consultanct International - UK - 2001) |
Overall
geotechnical investigation and lab testing and Seissmic
refraction |
| Oil installation depot -
Kollonnawa (Ceylon Petroleum Corporation - 2001) |
Sub surface investigation along
the pipe line trace 45 Nos. boreholes |
| Geotechnical
investigation for Colombo Katunayake Expressway Project -
construction stage (Kean Nam Enterprises - 2001) |
Drilling 80
core boreholes along the CKE route |
| Static cone penetration for
Colombo Katunayake Expressway Project - design work (Kean Nam
Enterprises - 2001) |
Carry out SCPT along the CKE
route and interpretation |
| Addl. drilling
for bridge structures for Colombo Katunayake Expressway Project
(Kean Nam Enterprises - 2001) |
48 core
drilling holes were done at bridge location |
| Anuradhapura Group Town Water
Supply Scheme (National Water Supply & Drainage Board - 2001) |
Sub surface investigation
including resistivity survey |
| Control fill
and stability analysis at Athurugiriya and Ratnapura
sub-stations (Ceylon Electricity Board - 2001) |
Field
investigation and testing |
| Coastal Resources Management
Project for control sea erosion at Dickowita, Lansiyagama,
Hikkaduwa and Wadduwa (Ministry of Fisheries - ADB Funded -
2001) |
Field investigation and testing |
|
Project & Client |
Description |
| Geotechnical investigation for a
sub-station at Bentota (Ceylon Electricity Board - 2002) |
Drilling and testing |
| Design
consultancy for a sanitary landfill at Seethawaka Industrial
Park, Avissawella (Board of Investment - 2002) |
Drilling and
testing |
| Japan Sri Lanka Friendship Road -
Madiwela (Urban Development Authority - 2002) |
Embarkment ground improvement
design and consultancy supervision |
| Geotechnical
investigation for the proposed harbour at Chilaw (Halcrow Group
UK - 2002) |
Drilling and
testing |
| Geotechnical investigation for
the proposed harbour at Hambantota (Sri Lanka Ports Authority -
2002) |
Drilling, testing and Seissimic
Survey |
| Geotechnical
investigation for C V Goonaratne Water Supply Scheme at
Seethawaka Industrial Park (National Water Supply & Drainage
Board - 2002) |
Drilling and
testing |
| Restoring the settle column of
Vahalkada at Yatagala Raja Maha Vihara, Galle (National Physical
Planning Dept. - 2002) |
Drilling, testing and design |
| Geotechnical
investigation for the Water Supply Scheme at Horana (Board of
Investment - 2002) |
Drilling,
testing and Seissimic survey |
| Geotechnical investigation for
the Water Supply Scheme at Kegalle (National Water Supply &
Drainage Board - 2002) |
Drilling and testing |
| Greater Galle Water Supply Scheme
(National Water Supply & Drainage Board - 2002) |
Earth work design and plate
bearing test |